1:  In Layman's five step size-up process, the time of day is considered part of what?
A: Facts
B: Probabilities
C: Situation
D: Descisions

2:  According to the NFA size-up model, the question, "Where is it going" would be first answered in which phase?
A: Preincident information
B: Initial size-up
C: Secondary size-up
D: Ongoing size-up

3:  According to the NFA fire flow formula, how many gallons per minute are needed to control a fire in a single story, 300' x 100' building that is 25% involved with no exposures?
A: 1000
B: 2500
C: 5000
D: 10000

4:  When conducting a risk/benefit evaluation of a fire with a smoke charged residential structure with no known occupants, an adequate water supply and staffing, what is the most appropriate strategy?
A: Offensive
B: Defensive
C: Transitional
D: Investigative

5:  Which is the best formula for calculating needed fire flow?
A: Kimball's rule of thumb
B: Iowa State University rate-of-flow formula
C: National Fire Academy fire flow formula
D: Whichever method the officer finds easiest to use

6:  According to Layman, which two tactical priorities do not have a priority order?
A: Ventilation and Overhaul
B: Salvageand Overhaul
C: Ventilation and Salvage
D: Confinement and Extinguishment

7:  According to Layman, the process of preventing a fire from spreading to the uninvolved areas of the same structure is considered what?
A: Exposure protection
B: Confinement
C: Extinquishment
D: Overhaul

8:  What verifies that all personnel are present on an incident?
A: Rapid Intervention Crew
B: Rapid Intervention Team
C: Personnel Accountability Report
D: Verification and Information Status Report

9:  What construction method was common in residential structures prior to 1940?
A: Platform
B: Web-joist
C: Lightweight
D: Balloon

10:  One of the initial priorites that must be considered in a high rise fire is what?
A: Support branch
B: Service branch
C: Lobby control
D: All of the above.